
Valves Maintanance
Columbia Pipe reviewed valve options for the applications selected DFT as the best option to present.

Fast changeover for Kishwaukee Hospital
Rock Valley Culligan was contracted to install new water softeners at a hospital. They were given a limited budget and a short time frame to complete the work.

New Screens Salvage Grits and Ethanol Production
After a grits bed inspection, Illinois Corn noticed the collapsing of three screens which were vital to the production of ethanol and grits. The screens needed to be fixed quickly.

Extra Effort Goes A Long Way
EDM ordered a Lint Trap which was a critical component to a job, but constant delays from a manufacturer had them fearful that the product wouldn’t arrive on time for an important concrete pour.

Expedited Order Saves Important Install
Quality Control Systems needed a flanged pump for a weekend shut down. A pump connector ordered directly from the manufacturer didn’t arrive on time so QCS placed an urgent call to Columbia Pipe.

Alternative Solution and Significant Savings
Backorder valves from a Columbia Pipe supplier put Applied in a tough spot to complete an important job.

Researched. Fulfilled. Delivered.
A same-day delivery to O’hare allowed Kerrigan to make a tight production deadline.

Quick Turnaround for Massive Air Loss
Fast thinking and delivery from a Columbia Pipe Specialist saved a NIPSCO plant from lost production time.

Long-term Answer for Scaling and Condensation Problem
When FCA-Chrysler experienced problems on their soft water lines, Columbia Pipe worked with Aquatherm to identify a solution.