Valves Maintanance

Columbia Pipe reviewed valve options for the applications selected DFT as the best option to present.

View Case Study

Fast changeover for Kishwaukee Hospital

Rock Valley Culligan was contracted to install new water softeners at a hospital. They were given a limited budget and a short time frame to complete the work.

View Case Study

New Screens Salvage Grits and Ethanol Production

After a grits bed inspection, Illinois Corn noticed the collapsing of three screens which were vital to the production of ethanol and grits. The screens needed to be fixed quickly.

View Case Study

Extra Effort Goes A Long Way

EDM ordered a Lint Trap which was a critical component to a job, but constant delays from a manufacturer had them fearful that the product wouldn’t arrive on time for an important concrete pour.

View Case Study

Expedited Order Saves Important Install

Quality Control Systems needed a flanged pump for a weekend shut down. A pump connector ordered directly from the manufacturer didn’t arrive on time so QCS placed an urgent call to Columbia Pipe.

View Case Study

Alternative Solution and Significant Savings

Backorder valves from a Columbia Pipe supplier put Applied in a tough spot to complete an important job.

View Case Study

Researched. Fulfilled. Delivered.

A same-day delivery to O’hare allowed Kerrigan to make a tight production deadline.

View Case Study

Quick Turnaround for Massive Air Loss

Fast thinking and delivery from a Columbia Pipe Specialist saved a NIPSCO plant from lost production time.

View Case Study

Long-term Answer for Scaling and Condensation Problem

When FCA-Chrysler experienced problems on their soft water lines, Columbia Pipe worked with Aquatherm to identify a solution.